Construction and lifting
Tower crane contractors and crane hire (erect, operate, dismantle): the wind call, at your height
Know tonight whether tomorrow's lifts are on, at jib height, not ground level.
- The odds of crossing my out-of-service limit, so the climb moves to the better day.
- A dated record of the forecast and the call, for the lift plan and the inspector.
Appointed Person / Crane Supervisor / Plant Manager / Lifting Operations Manager
The decision
Each shift: is the crane inside its in-service limit, when must it go out of service, and which day suits erection or climbing.
- How often
- Every shift; every lift near the limit; every storm warning
- Your limit, for example
- 16.5 m/s (60 km/h) recommended UK out-of-service speedSource: cpa.uk.net
- Height that matters
- 80 m
- The number to watch
- gust and mean at jib height
Live, right now, at 80 m
These are the real charts, running for Dublin Port. Search for your own place to re-point them.
The wind column with your height (80 m) picked out.
Odds at 80 m.
Where the weather models agree, and where they do not.
The call you make
As an Appointed Person, Crane Supervisor, or Plant Manager, you make the critical call each shift: is the crane inside its in-service limit, when must it go out of service, and which day suits erection or climbing. This decision is made every shift, for every lift near the limit, and with every storm warning. A wrong call can lead to significant downtime, as idle time still bills, and in the worst cases, prosecution or loss of the crane.
Your decision relies on accurate wind data at the working height of the jib, not just ground level readings. The Wind Agent provides wind data specifically at 80 m, interpolated to your exact working height, showing both gust and mean speeds. This allows you to plan operations, such as moving a crane erection or climb to a day with more favourable conditions, based on the odds of exceeding your out-of-service limit.
The ability to know tonight whether tomorrow's lifts are on, at jib height, is a key benefit. This forward visibility helps you organise your crew and equipment effectively, avoiding costly delays. The instrument helps you make informed decisions, reducing the risk of operating outside working parameters and ensuring adherence to your operational documents.
Where the wind actually is for you
The wind speed and gusts at the jib height of a tower crane can be significantly different from ground-level readings. Your operational limit is typically set by the crane manufacturer's load chart and the in-service or out-of-service limits in I.S. 361:2024 or BS 7121 codes of practice. These limits are usually expressed as a maximum allowable gust or mean speed at the working height.
The instrument shows wind at 10, 80, 120, and 180 m, interpolated to your specific working height in metres. It presents both gust and mean wind speeds, as both are critical for tower crane operations. Gusts are short, sudden increases in wind speed, which can exert considerable force on a crane, even if the mean wind speed is within limits. The instrument helps you monitor these critical metrics.
By focusing on the wind at your actual working height, you avoid relying on less relevant data. Heights below 10 m are extrapolated below the lowest model level and are badged as such, ensuring you understand the source of the data. This precise data allows you to compare against your crane's specific limits, ensuring operations are conducted within your defined parameters.
Reading the odds for this work
The instrument computes the odds, P(above your limit), by the hour. This is the fraction of ensemble members that predict wind speeds above your specified limit at your working height. The ensemble members are computed from model levels at 10, 80, 100, and 120 m. This gives you a clear indication of the likelihood of exceeding your operational limits.
The Agreement Spine feature shows where different weather models agree and where they do not. When models agree, the forecast is generally more reliable. When they diverge, it suggests higher uncertainty, which you might factor into your decision-making.
For example, if the odds of exceeding your limit are 20 per cent, you might proceed with caution, closely monitoring conditions. If the odds are 50 per cent, you might consider delaying non-critical lifts or preparing to go out of service. At 80 per cent, you would likely postpone operations or place the crane in weathervane mode, as the risk of exceeding your limit is high. The instrument never declares you to operate; your own document and the competent person on site make the call.
A day with it
Here is an example of how you might use the instrument during a typical day:
- 06:00: You check the instrument for the 80 m jib height. The forecast for 09:00 shows a 10 per cent chance of gust speeds exceeding your 36.9 mph limit, with mean wind at 20 mph and gusts at 30 mph. You decide to proceed with the planned lifts.
- 07:30: During the morning brief, you review the forecast again. The odds for 11:00 have increased to 30 per cent, with mean wind at 25 mph and gusts at 35 mph. You instruct the crane operator to be vigilant.
- 10:00: The instrument now shows a 60 per cent chance of gusts exceeding 36.9 mph by 13:00, with mean wind at 30 mph and gusts predicted at 40 mph. You decide to complete the current lift and then place the crane in weathervane mode.
- 12:30: Gusts are now consistently above 36.9 mph. The crane is out of service, in weathervane mode, and you are monitoring the forecast for the next available window.
- 17:00: The forecast for tomorrow morning shows a low probability of exceeding your limit. You plan to resume operations at 08:00.
Example: A Day in the Life of a Tower Crane Supervisor
- 06:00: Check the instrument for the 80 m jib height. Forecast for 09:00 shows 10% chance of gust speeds exceeding 36.9 mph, with mean wind at 20 mph and gusts at 30 mph. Decide to proceed with planned lifts.
- 07:30: During the morning brief, review the forecast again. Odds for 11:00 have increased to 30%, with mean wind at 25 mph and gusts at 35 mph. Instruct operator to be vigilant.
- 10:00: Instrument now shows 60% chance of gusts exceeding 36.9 mph by 13:00, with mean wind at 30 mph and gusts predicted at 40 mph. Decide to complete current lift, then place crane in weathervane mode.
- 12:30: Gusts are consistently above 36.9 mph. Crane is out of service, in weathervane mode. Monitor forecast for next available window.
- 17:00: Forecast for tomorrow morning shows low probability of exceeding limit. Plan to resume operations at 08:00.
Setting your limit from your own document
Your operational limit for tower crane wind speed is a critical parameter, derived directly from your crane manufacturer's load charts and your company's operational procedures. These limits are typically set by your site rules and national standards like I.S. 361:2024 or BS 7121 codes of practice, and they define the maximum gust or mean wind speed at which your crane can operate.
When you set up the instrument, you input your specific limit, which is then used to calculate the P(above your limit) odds. The instrument's preset height for tower cranes is 80 m, with a default limit of 36.9 mph for gust and mean at jib height. However, you can adjust this to precisely match the limit specified in your own documentation. This customisation ensures that the forecasts and odds are directly relevant to your specific crane and operational context.
It is essential that the limit you input accurately reflects the manufacturer's guidance and your company's protocols. The instrument does not provide a 'declared' limit; it only helps you monitor the likelihood of exceeding the limit you have set based on your own documents. The Appointed Person or Lifting Operations Manager is responsible for defining and adhering to these limits.
The record, and why it matters here
Maintaining a dated record of forecasts and decisions is vital for tower crane operations. The instrument provides a dated record page that logs what was forecast, what was observed, the limit you used, and the call you made. This record serves as an auditable trail of your decision-making process.
Inspectors or regulatory bodies, such as those enforcing I.S. 361:2024, may request these records as part of a lift plan review or an incident investigation. Having a clear, unalterable record demonstrates due diligence and adherence to operational procedures. It provides proof that wind conditions were assessed against your set limits before operations commenced or continued.
For you, the Appointed Person or Lifting Operations Manager, this record is a key part of your risk management strategy. It allows you to review past decisions, learn from them, and justify your actions if questions arise. This frozen record page is an important tool for accountability and continuous improvement in managing wind risk for your fleet.
Ireland
Ireland's weather, particularly with its Atlantic exposure, presents specific challenges for tower crane operations. The storm season, generally from October to March, brings frequent high winds and gusts that can quickly exceed operational limits. Additionally, spring equinox gales can occur, and erection and dismantling windows are needed year-round, making consistent wind monitoring crucial.
National standards, such as I.S. 361:2024, published on 16 August 2024, now govern the use of tower cranes in Ireland. This standard, read in conjunction with I.S. 360:2019, sets the framework for your operational decisions. Met Éireann, as the national forecaster, provides general weather information, but the instrument provides specific, height-adjusted wind data directly relevant to your crane's jib height.
Understanding the seasonal variations and being able to anticipate high wind events is paramount. The instrument allows you to see the odds of exceeding your out-of-service limit well in advance, enabling you to move sensitive operations like erection or climbing to a better day. This proactive approach helps manage the risks associated with Ireland's often unpredictable wind conditions.
Questions people ask
How does the instrument help with planning crane erection or dismantling?
Crane erection and dismantling are among the most wind-sensitive jobs. The instrument provides P(above your limit) by the hour, calculated at your crane's working height. This allows you to identify windows of lower wind risk days in advance, enabling you to schedule these critical operations more effectively. By knowing the odds of exceeding your out-of-service limit, you can make informed decisions to postpone or reschedule, reducing the risk of weather-related delays and ensuring the operation proceeds under suitable conditions.
Can I use the instrument for multiple cranes across different sites?
Yes, the Ops plan includes a fleet board feature specifically designed for managing multiple cranes across various sites. This allows you to monitor the wind conditions and P(above your limit) for each crane from a single interface. You can set individual limits and working heights for each crane, providing a centralised overview to help you organise your entire fleet's operations efficiently.
What if my crane's working height is below 10 m?
The instrument provides wind data at 10, 80, 120, and 180 m. If your crane's working height is below 10 m, the wind speed is extrapolated below the lowest model level. This data is clearly badged to indicate its extrapolated nature. While the instrument provides this information, it is important to exercise additional caution and refer to your crane's specific operational guidelines for working at lower heights, as local obstructions can have a greater impact.
Does the instrument replace my crane's anemometer?
The instrument provides modelled wind forecasts and historical records, which are distinct from the real-time measurements of your crane's own anemometer. Your crane's anemometer provides immediate, on-site wind observations. The instrument complements this by offering forward-looking forecasts and a broader understanding of wind conditions at various heights, aiding in planning and decision-making. It does not replace the immediate, measured data from your machine's own anemometer.
How accurate are the wind forecasts at jib height?
The wind forecasts are derived from meteorological models and interpolated to your specified jib height (e.g., 80 m). These models consider various atmospheric conditions to provide a comprehensive prediction. While no forecast is absolute, the instrument's P(above your limit) feature, based on ensemble members, gives you a probabilistic view of exceeding your limit. The Agreement Spine also shows model consensus, helping you assess forecast reliability. It is a modelled forecast, not a measured observation.
What it costs to get this wrong
In Liverpool in 2007 a luffing crane fell in an 82 km/h gust lasting about one second that a 3-second-average alarm did not catch; one man died.
Source: vertikal.netWhat you use today, and what this adds
| What you use today | Cost |
|---|---|
| An anemometer on site or on the machine | One-off hardware |
| A forecast app | Varies |
| The national weather service forecast and warnings | Free |
| A free forecast app | Free |
What this adds
- Shear Glass at 80 m
- P(>limit) per hour
- Frozen record page
- Fleet board for several cranes
Set it up in a minute
- Preset
- Crane
- Height
- 80 m
- Limit
- 16.5 m/s
- Place
- Dublin Port
OpsOps adds the fleet board across all your sites and public boards your crews can open.
Try it first, no account.
In Ireland
Where people in this work talk
Read next
Industry guides
Others in construction and lifting
- MEWP / cherry-picker operators, facade, cladding and glazing installers
- Mobile crane hire and Appointed Persons / lift planners
- Health and safety managers and advisers (the person who needs the record)
- Main contractors' site managers and construction managers (CIF members)
- Surveyors and drone (UAS) operators on construction sites
- Steel erectors and precast concrete installers
Sources
The Wind Agent shows the wind and the odds. Your limit and the competent person on site make the call.