Construction and lifting

Health and safety managers and advisers (the person who needs the record): the wind call, at your height

A dated record that we checked the forecast at height and acted on it.

  • Limits for each activity in one place, with a restart threshold.
  • Evidence for the safety file and for the inspector.

Health and Safety Manager / Safety Adviser / Competent Person / PSCS

The decision

Set the stop-work wind limit for each activity, name who decides, and prove after the fact that the rule was followed.

How often
Daily monitoring; per audit; per incident
Your limit, for example
12.5 m/s (MEWP, BS EN 280)Source: hseblog.com
Height that matters
40 m
The number to watch
gust at working height by activity

Live, right now, at 40 m

These are the real charts, running for Dublin Port. Search for your own place to re-point them.

SEE THIS AT YOUR SITE Dublin Port
Shear Glass Dublin Port · 40 m
CHART LOADINGglassReading Dublin Port…

The wind column with your height (40 m) picked out.

Exceedance fan Dublin Port · 10 m
CHART LOADINGfanReading Dublin Port…

Odds at 10 m, the nearest ensemble level to your 40 m.

Agreement strip Dublin Port · 10 m
CHART LOADINGagreement_stripReading Dublin Port…

Where the weather models agree, and where they do not.

The call you make

As a Health and Safety Manager or Adviser, you set the stop-work wind limit for each activity on site. This involves defining the specific wind speed at which work must cease, and naming the competent person responsible for making that decision. This call is made daily, or whenever an audit or incident requires a review of conditions.

Your responsibility extends to proving that the established rule was followed. This often means providing a dated record of the forecast and the decision made. A wrong call can lead to stop-work delays if decisions are overly conservative, or, more critically, to incidents if work proceeds under unsuitable wind conditions.

After any significant wind event or incident, you will review the records to confirm that the site's wind limits were respected. This diligence is part of your commitment to site risk management and regulatory adherence. The focus is on clear, documented adherence to your own established limits.

Your role is to ensure that the site's activities are managed within defined wind parameters, supported by clear evidence of monitoring and adherence. This forms a core part of your daily operational oversight and incident management.

Where the wind actually is for you

The wind conditions that matter most are those at your specific working height and for the particular activity. For example, a Mobile Elevating Work Platform (MEWP) operating at 40 metres will experience different wind speeds than ground-level activities. It is the gust speed at this working height, rather than the mean wind speed, that often dictates stop-work limits for many activities.

Your site's operational limits for wind are set by you, based on manufacturers' specifications, industry standards, or your own risk assessments. These limits are typically expressed as a maximum gust speed at a specific height. For instance, the limit for MEWP operation under BS EN 280 is commonly cited as 12.5 m/s.

The instrument interpolates wind speeds to your exact working height in metres, from 10, 80, 120, and 180 m. This provides a specific forecast relevant to your operations. It displays both mean wind speed and gust speeds, allowing you to focus on the metric that governs your stop-work criteria.

Understanding the wind at your working height is critical. The instrument allows you to input your specific height and see the forecast for that level, ensuring that the information you act upon is directly relevant to the task at hand. Heights below 10 m are extrapolated below the lowest model level and badged as such.

Reading the odds for this work

The instrument provides the probability (P) that wind speeds will be above your set limit, hour by hour. This is computed from an ensemble of weather models: if 20 out of 100 ensemble members predict wind above your limit, the odds are 20 per cent. This fraction is not a calibrated certainty, but a direct representation of model outcomes.

When the odds are, for example, 20 per cent for a particular hour, it suggests that a minority of the models predict exceeding your limit. You might proceed with caution, monitoring conditions closely. If the odds rise to 50 per cent, half the models agree on exceeding the limit, indicating a significantly increased risk. At this point, you might consider preparing to stop work or implementing additional controls.

If the odds reach 80 per cent or higher, a large majority of the models predict exceeding your limit. This would typically trigger a stop-work decision, as the likelihood of unsuitable conditions is high. The 'Agreement Spine' feature also shows where different weather models agree or disagree, providing further context to the odds.

These odds help you make informed, proactive decisions. They allow you to understand the range of possible wind conditions and manage risk according to your site's specific wind limits, rather than relying on a single forecast outcome.

A day with it

This is an example of how you might use the instrument during a working day:

  • 06:00: You check the forecast for the day. For a MEWP operating at 40 metres, your limit is 12.5 m/s gust. The forecast shows a 10 per cent chance of exceeding this limit between 09:00 and 12:00.
  • 07:00: You brief the site team, advising them that MEWP work should be prioritised in the morning, as the odds rise to 60 per cent between 13:00 and 16:00.
  • 11:00: You re-check the forecast. The odds for the afternoon have increased to 70 per cent. You issue a pre-emptive stop-work order for MEWP operations starting at 13:00.
  • 13:00: All MEWP operations cease as planned. You record this decision and the forecast data.
  • 16:00: The forecast shows the odds dropping to 20 per cent for the following morning. You plan for MEWP work to resume then.
  • 17:00: You review the day's record, confirming that the stop-work decision was made and logged based on the forecast and the site's 12.5 m/s limit. This record is available for your risk management file.

Example: A Day with The Wind Agent for a Health and Safety Manager

  1. 06:00: You check the forecast for the day. For a MEWP operating at 40 metres, your limit is 12.5 m/s gust. The forecast shows a 10 per cent chance of exceeding this limit between 09:00 and 12:00.
  2. 07:00: You brief the site team, advising them that MEWP work should be prioritised in the morning, as the odds rise to 60 per cent between 13:00 and 16:00.
  3. 11:00: You re-check the forecast. The odds for the afternoon have increased to 70 per cent. You issue a pre-emptive stop-work order for MEWP operations starting at 13:00.
  4. 13:00: All MEWP operations cease as planned. You record this decision and the forecast data.
  5. 16:00: The forecast shows the odds dropping to 20 per cent for the following morning. You plan for MEWP work to resume then.
  6. 17:00: You review the day's record, confirming that the stop-work decision was made and logged based on the forecast and the site's 12.5 m/s limit. This record is available for your risk management file.

Setting your limit from your own document

Your stop-work wind limit is a critical parameter, and it originates from your own documentation. This could be a manufacturer's operating manual, an industry standard, or your company's specific risk assessment for a given activity. For instance, for MEWP operations, the limit is commonly set at 12.5 m/s, as per BS EN 280.

When you use the instrument, you will input this specific limit. The instrument is preset to a common working height of 40 metres for crane operations, with a gust limit of 28.0 mph, but you can adjust these to match your exact requirements. It is essential that the limit you set in the instrument directly reflects the limit stated in your official documents.

This ensures that the P(above your limit) calculation is always relevant to your operational constraints. The instrument does not set limits; it uses the limits you provide. Your role as a Health and Safety Manager is to ensure that the limits entered are accurate and consistent with your site's risk management protocols and regulatory requirements.

By accurately inputting your documented limits, you create a direct link between your risk management procedures and the real-time wind forecast, enhancing your ability to make evidence-based decisions.

The record, and why it matters here

As a Health and Safety Manager, a dated record of wind forecasts and decisions is not just good practice; it is often a requirement. This record serves as evidence that due diligence was exercised in managing wind-related risks. It captures what was forecast, the limit you applied, and the call made at that time.

This record is invaluable for audits, incident investigations, and demonstrating adherence to regulatory bodies such as the HSA. It provides an undeniable account of the conditions considered and the actions taken, protecting both your organisation and the competent person who made the decision.

For example, if an incident occurs or an inspector inquires about a particular day, you can retrieve the exact forecast at height, your set limit, and the recorded decision. This eliminates ambiguity and provides concrete proof that your wind management protocols were followed. The record page is designed to be frozen and exportable for your risk management file.

Maintaining this record consistently across all sites and activities reinforces your risk management culture and provides a robust defence against claims of negligence. It is a fundamental tool for accountability and continuous improvement in wind risk management.

Ireland

Ireland's geographical position means it is particularly exposed to Atlantic weather systems, making wind management a significant concern for construction and other outdoor activities. The storm season, typically from October to March, brings higher risks of strong winds and requires heightened vigilance.

Met Éireann, as the national forecaster, provides general weather information, but specific, height-adjusted wind data is crucial for operational decisions. Managing wind risk in Ireland involves understanding both the general meteorological patterns and the specific microclimates of your sites.

Organisations like the HSA (Health and Safety Authority) provide guidance on managing risks in construction, including those related to working at height and in adverse weather. While the instrument does not claim to approve work, its record-keeping capabilities align with the need for demonstrable risk management practices.

Implementing robust wind management protocols, supported by precise data, helps address the unique challenges posed by Ireland's weather. This approach supports your efforts to maintain appropriate working conditions.

Questions people ask

How does the instrument account for wind gusts versus mean wind speed?

The instrument displays both mean wind speed and gust speeds. For most operational limits, particularly for activities like MEWP operation or crane work, the gust speed is the critical factor. You set your stop-work limit based on the gust speed at your specific working height, as dictated by your internal documents or industry standards. The instrument then calculates the probability of exceeding this gust limit, providing you with the most relevant information for your decision-making.

Can I set different wind limits for various activities on one site?

Yes, you can set different wind limits for various activities. Your site may have multiple operations, each with its own specific wind speed threshold based on equipment, task, or height. The instrument allows you to define and monitor these distinct limits. This flexibility ensures that each activity is assessed against its appropriate wind criteria, supporting precise risk management across your operations.

How does the instrument help with regulatory audits or incident investigations?

The instrument creates a dated record of what was forecast, the wind limit you set, and the decision made at that time. This record is exportable and provides concrete evidence of your due diligence in managing wind-related risks. In an audit or investigation, you can present this record to demonstrate that you followed established protocols and made informed decisions based on available data, aligning with the requirements of bodies like the HSA.

What if my working height is below 10 metres?

The instrument provides wind data at standard model levels of 10, 80, 120, and 180 metres. If your working height is below 10 metres, the instrument extrapolates the wind speed below the lowest model level. This extrapolated data is clearly badged to indicate that it is derived from the model's lowest level. While it provides an estimate, it is important to consider this extrapolation when making decisions for very low working heights.

How does the 'Agreement Spine' feature assist my decision-making?

The 'Agreement Spine' shows where different weather models agree and disagree on the wind forecast. When models largely agree, it can increase your confidence in the forecast. Conversely, if there is significant disagreement, it signals higher uncertainty, prompting you to exercise more caution or to monitor conditions more frequently. This feature adds a layer of understanding to the forecast, helping you gauge the reliability of the predictions and adjust your risk assessment accordingly.

What you use today, and what this adds

What you use todayCost
An anemometer on site or on the machineOne-off hardware
The national weather service forecast and warningsFree
Manufacturer guidanceVaries

What this adds

  • Frozen record page
  • Fleet board across sites
  • Alerts at each activity limit

Set it up in a minute

Preset
Crane
Height
40 m
Limit
12.5 m/s
Place
Dublin Port
Open the instrument set up for you

OpsOps adds the fleet board across all your sites and public boards your crews can open.

Try it first, no account.

In Ireland

Where people in this work talk

Read next

Industry guides

Others in construction and lifting

Sources

  1. hseblog: stop-work framework
  2. NHBC high winds checklist
  3. Construction News: HSA 2024 fatalities
  4. HSA work at height campaign
  5. IOSH Ireland branch

The Wind Agent shows the wind and the odds. Your limit and the competent person on site make the call.