Aviation, events and public bodies
Temporary structure, marquee and staging companies: the wind call, at your height
Warn me and the client at 60% and 80% of the rating, so nobody argues later.
- One dated page for the council that says what we knew and when.
- Each structure's limit entered once, then alerts that use it.
Operations / Site Manager / Structures Competent Person
The decision
Plan build and derig windows, and decide when to strike a roof or lower trusses against each structure's rating.
- How often
- Per build and per event day
- Your limit, for example
- 60% / 80% of each structure's maximum wind load (Purple Guide action triggers)Source: thepurpleguide.co.uk
- Height that matters
- 15 m
- The number to watch
- gust at roof and truss height
Live, right now, at 15 m
These are the real charts, running for Dublin Port. Search for your own place to re-point them.
The wind column with your height (15 m) picked out.
Set your own limit in the instrument to see the odds of passing it. Odds at 10 m, the nearest ensemble level to your 15 m.
Where the weather models agree, and where they do not.
The call you make
As an Operations or Site Manager, you are the competent person on site. You make the calls about when to build, when to derig, and when to take action on a temporary structure. These decisions are made per build and per event day, often under pressure.
A wrong call can lead to significant issues. If you misjudge conditions, you might face overtime costs for derigging, or the expense of replacing damaged structures. More critically, there are implications for personnel if a structure is compromised by wind.
Your decisions are guided by the maximum wind load ratings of each structure. You need clear information to plan your build and derig windows, and to know precisely when to strike a roof or lower trusses to prevent damage or collapse.
Your role involves protecting your crew, your equipment, and your client's event. Having clear, timely wind data helps you make these critical decisions with confidence, ensuring operations run smoothly and without incident.
Where the wind actually is for you
For temporary structures, the crucial wind measurement is the gust at roof and truss height. This is typically around 15 metres above ground, but it depends on your specific structure's height. Wind speeds can vary significantly with height, so knowing the wind at your working level is essential.
The instrument interpolates wind speeds to your exact working height, showing you the gust beside the mean wind speed. This allows you to focus on the most impactful measurement for your structures.
Your limit is set by the supplier's wind calculation competent person, based on each structure's design. This is not a general guideline but a specific threshold for your equipment. You will enter this limit into the instrument, which then uses it to provide relevant alerts.
Understanding the difference between mean wind and gust is vital. Gusts are short, sharp increases in wind speed that exert sudden, powerful forces on structures, often exceeding the mean wind speed by a considerable margin. It is these gusts that typically dictate when you need to take action.
Reading the odds for this work
The instrument shows you the probability (P) that the wind will be above your set limit for each hour. This is calculated from an ensemble of weather models. If, for example, 20 per cent of these models predict wind above your limit, it indicates a low but present risk. At this level, you might proceed with caution, perhaps allocating extra crew for monitoring.
If the P(above your limit) rises to 50 per cent, it suggests a significant chance of exceeding your operational threshold. At this point, you might consider delaying non-essential work, preparing equipment for securing, or initiating preliminary steps to strike roofs or lower trusses.
When 80 per cent or more of the ensemble members show wind above your limit, the risk is high. This would typically trigger immediate action, such as halting all work at height, securing structures, or initiating full roof strikes or truss lowering procedures. The Agreement Spine shows you where the models agree or disagree, providing further context for these probabilities.
These percentages are not absolute commands, but a clear indication of risk, allowing you to align your operational decisions with your company's own action triggers, such as those in the Purple Guide.
A day with it
Here is an example of how you might use the instrument during an event build:
- 06:00: Check the instrument for the 15-metre gust forecast. The P(above your limit) is 10% for the morning, rising to 30% by 14:00. You decide to proceed with the main structure build.
- 10:00: An alert arrives: P(above your limit) has risen to 45% for 16:00, with gusts of 40 mph forecast at 15m. You instruct the crew to prepare for potential roof striking later in the day.
- 13:00: A second alert shows P(above your limit) is now 65% for 17:00, with gusts of 45 mph. You decide to begin striking the roof of the main marquee, ahead of the forecast.
- 16:00: The wind increases as forecast, with gusts reaching 42 mph. The roof is already down, and the structure is secure. You notify the client of the proactive measures taken.
- 20:00: The wind has eased. You review the recorded forecast versus actual observations, noting your decision to act early prevented potential issues. The record is ready for sign-off.
Example: A Day Managing Wind for a Marquee Build
- 06:00: Check the instrument for the 15-metre gust forecast. The P(above your limit) is 10% for the morning, rising to 30% by 14:00. You decide to proceed with the main structure build.
- 10:00: An alert arrives: P(above your limit) has risen to 45% for 16:00, with gusts of 40 mph forecast at 15m. You instruct the crew to prepare for potential roof striking later in the day.
- 13:00: A second alert shows P(above your limit) is now 65% for 17:00, with gusts of 45 mph. You decide to begin striking the roof of the main marquee, ahead of the forecast.
- 16:00: The wind increases as forecast, with gusts reaching 42 mph. The roof is already down, and the structure is secure. You notify the client of the proactive measures taken.
- 20:00: The wind has eased. You review the recorded forecast versus actual observations, noting your decision to act early prevented potential issues. The record is ready for sign-off.
Setting your limit from your own document
Your operational limit for wind is a critical piece of information. It comes directly from your own documentation, typically derived from the manufacturer's specifications for each temporary structure. This might be expressed as a maximum wind speed, or more commonly, as action triggers at percentages of the structure's maximum wind load.
For example, industry guidance, such as the Purple Guide, often recommends taking action at 60% and 80% of a structure's maximum wind load. You will input these specific limits into the instrument. The instrument's preset height for this work is 15 metres, focusing on gust at roof and truss height.
Once entered, the instrument uses these values to calculate P(above your limit) and trigger alerts. This ensures that the wind information you receive is always directly relevant to your specific operational thresholds and the structures you are working with.
This precise setting means you are not relying on generic forecasts, but on data tailored to your operational needs, allowing you to make informed decisions based on your own established protocols.
The record, and why it matters here
For temporary structure operations, a clear and dated record of wind conditions and decisions is essential. The instrument provides a dedicated record page, documenting what was forecast, what was observed, the specific limit you used, and the call you made.
This record is invaluable for several reasons. Councils, particularly during event licensing, often require proof of due diligence regarding wind management. Having a single, dated page that shows what you knew and when, along with your actions, provides this necessary documentation.
Beyond regulatory requirements, this record serves as an internal audit trail. It helps you review past decisions, understand how forecasts aligned with actual conditions, and refine your operational procedures for future events. It also provides a factual basis if questions arise from clients or other stakeholders about your wind management decisions.
This archived information removes ambiguity and provides a transparent account of your decision-making process, protecting both your company and your crew.
Ireland
Working with temporary structures in Ireland means contending with specific wind conditions, particularly due to the country's Atlantic exposure. The storm season typically runs from October to March, bringing higher wind risks, but significant wind events can occur at any time, impacting the main event season from April to October and Christmas markets.
Irish councils often apply guidance from documents such as the Purple Guide or IStructE recommendations as best practice during event licensing. This means your wind management plans need to align with these recognised standards.
The national forecaster, Met Éireann, provides general weather information, but for the precise, height-specific gust data needed for temporary structures, a more tailored approach is required. The instrument helps you meet these specific needs.
Understanding and preparing for these conditions is key to successful and incident-free operations. By focusing on gust forecasts at your specific working height and integrating your own structure limits, you can manage the challenges posed by Ireland's variable weather.
Questions people ask
How does the instrument help me with the Purple Guide action triggers?
The Purple Guide often recommends taking action at 60% and 80% of your structure's maximum wind load. You can input these percentages as your limits into the instrument. It will then calculate the probability of exceeding these specific thresholds for each hour, providing you with advance notice. This allows you to align your operational decisions directly with the Purple Guide's recommended action triggers, ensuring appropriate and proactive management of wind risk.
Can I use this for multiple structures with different limits?
Yes, the instrument is designed to manage multiple structures, each with its own specific wind load rating. You enter each structure's limit once. The system then provides tailored alerts and forecasts based on that individual structure's threshold. This feature is particularly useful for companies managing a fleet of diverse temporary structures, as it centralises wind risk management and streamlines decision-making across all your projects. You can monitor all structures from a single dashboard.
How does the instrument help me communicate with clients?
The instrument provides clear, objective data that you can share with clients. When you need to take action, such as striking a roof, you can show them the forecast, the P(above your limit), and your operational thresholds. This transparency helps avoid disputes and builds trust. The dated record page also serves as an official document, demonstrating that your decisions were based on available meteorological information and established protocols, ensuring everyone is informed and understands the rationale behind your actions.
What if my structure height is below 10 metres?
The instrument provides wind data at 10, 80, 120, and 180 metres. If your working height is below 10 metres, the instrument extrapolates the wind speed down to your specified height. This extrapolated data is clearly badged as such, indicating that it is derived from the lowest model level rather than being a direct model output. This still provides a useful indication of wind conditions at your specific working height, allowing you to make informed decisions for lower structures.
How does the instrument help with planning build and derig windows?
The instrument provides hourly forecasts of wind speed and the P(above your limit) for up to several days ahead. This allows you to identify periods of lower wind speeds, which are ideal for building or derigging structures. By understanding when wind conditions are likely to exceed your operational limits, you can schedule your work more effectively, avoiding unnecessary delays and potential damage. This proactive planning helps optimise your crew's time and resources, leading to more efficient project execution.
What you use today, and what this adds
| What you use today | Cost |
|---|---|
| An anemometer on site or on the machine | One-off hardware |
| A free forecast app | Free |
| The national weather service forecast and warnings | Free |
What this adds
- Alerts at 60% and 80% of your rating
- Frozen record page
- Fleet board across structures
- Public board for crew
Set it up in a minute
- Preset
- Event
- Height
- 15 m
- Limit
- you set it
- Place
- Dublin Port
OpsOps adds the fleet board across all your sites and public boards your crews can open.
Try it first, no account.
In Ireland
Irish councils apply UK-derived guidance (Purple Guide, IStructE) at event licensing.
Where people in this work talk
- IStructE guidance
- Council licensing officers as referrers
Read next
Industry guides
- Outdoor festivals and marquees: managing wind risk for safe events
- Outdoor hospitality and beer gardens: managing wind for customer comfort and safety
Others in aviation, events and public bodies
Sources
The Wind Agent shows the wind and the odds. Your limit and the competent person on site make the call.