Aviation, events and public bodies

Film and TV production units (cranes, drones, sets): the wind call, at your height

Will we hit 25 mph at the crane tomorrow afternoon?

  • A wind note ready for the call sheet.
  • A dated record for the insurer that we stopped at the right time.

1st AD / Location Manager / Safety Adviser / Key Grip

The decision

Shoot or hold for camera cranes, drones, flown rigs and exterior sets.

How often
Per shoot day, often hourly
Your limit, for example
32 mph (general crane stop guidance, not camera-specific)Source: scarlet-tech.com
Height that matters
20 m
The number to watch
gust at crane height

Live, right now, at 20 m

These are the real charts, running for Dublin. Search for your own place to re-point them.

SEE THIS AT YOUR SITE Dublin
Shear Glass Dublin · 20 m
CHART LOADINGglassReading Dublin…

The wind column with your height (20 m) picked out.

Exceedance fan Dublin · 10 m
CHART LOADINGfanReading Dublin…

Odds at 10 m, the nearest ensemble level to your 20 m.

Agreement strip Dublin · 10 m
CHART LOADINGagreement_stripReading Dublin…

Where the weather models agree, and where they do not.

The call you make

As a 1st AD, Location Manager, Adviser, or Key Grip, you often need to decide whether to shoot or hold due to wind. This applies to camera cranes, drones, flown rigs, and exterior sets. These decisions are made per shoot day, and frequently on an hourly basis, especially when working with sensitive equipment or structures. Your role is to ensure operations proceed efficiently while maintaining standards for personnel and equipment.

A wrong call can lead to significant financial costs, as a single shoot day can run to thousands or even far more. Beyond financial implications, there are also considerations for the crew and equipment. Your role is to ensure operations proceed efficiently while maintaining operational standards.

The core question often is: "Will we hit 25 mph at the crane tomorrow afternoon?" This requires precise, location-specific wind information to inform your decision-making. The ability to forecast and record these conditions is key to managing your production schedule and protecting your team and assets. The instrument provides the data needed to make these critical calls, helping you to manage risks effectively and keep your production on track.

Where the wind actually is for you

Your work often involves specific heights, such as 20 metres for a camera crane or other elevated equipment. Wind conditions can vary significantly at different heights. The instrument provides wind data at standard heights of 10, 80, 120, and 180 metres, and interpolates this to your specific working height, such as 20 metres.

It is important to distinguish between mean wind speed and gusts. Gusts are short, sudden increases in wind speed and are often the critical factor for operations involving cranes, drones, or flown rigs. While the mean wind speed might be within limits, a gust exceeding your threshold can pose a risk. The instrument shows gusts alongside the mean wind speed.

Your operational limit, such as 25 mph gust at crane height, is typically set by the equipment manufacturer, your call-sheet plan, or your insurer. This limit is specific to your equipment and site rules, and is what you will use to make your shoot/hold decisions.

Reading the odds for this work

The instrument shows the odds of the wind exceeding your specified limit, expressed as P(above your limit) by the hour. This is computed from ensemble members at 10, 80, 100, and 120 metres. It represents the fraction of ensemble members that predict wind speeds above your limit for a given hour, not a calibrated certainty. This helps you understand the probability of encountering challenging wind conditions.

The Agreement Spine feature shows where different weather models agree and where they do not. This insight can help you assess the reliability of the forecast. When models largely agree, you can have a higher degree of confidence in the forecast. When they diverge, it suggests greater uncertainty, prompting more caution.

For example, if the odds are around 20 per cent, you might proceed with caution, monitoring conditions closely. At 50 per cent, you might start preparing for a hold, perhaps rigging down non-essential items. If the odds reach 80 per cent, you would likely implement a hold, as the probability of exceeding your limit is high. Your own operational document will guide your specific actions at these thresholds.

A day with it

It is an example of a shoot day for a camera crane at 20 metres, with a limit of 25 mph gust.

At 07:00, the morning brief shows a 20 per cent chance of exceeding 25 mph gust at 20 metres between 14:00 and 16:00. You decide to proceed with the morning's shoot as planned, while keeping an eye on later forecasts.

By 10:00, a new forecast shows the odds have increased to 40 per cent for the 14:00 to 16:00 window. You brief the crew about the potential for a hold later in the afternoon and prepare alternative shots.

At 13:00, the odds for 14:00 to 16:00 are now 60 per cent. You decide to hold the crane operations from 14:00, moving to interior shots or other tasks not affected by wind. You log this decision.

By 16:00, the wind has eased, and the odds drop to 10 per cent for the rest of the day. You decide to resume crane operations, making up some lost time. The instrument provides a dated record of these decisions, including the forecast, your limit, and the call you made.

Example: Camera Crane Operations at 20 metres

  1. It is an example of a shoot day for a camera crane at 20 metres, with a limit of 25 mph gust.
  2. 07:00: Morning brief shows a 20 per cent chance of exceeding 25 mph gust at 20 metres between 14:00 and 16:00. Proceed as planned.
  3. 10:00: New forecast shows odds increased to 40 per cent for 14:00-16:00. Brief crew on potential hold, prepare alternative shots.
  4. 13:00: Odds for 14:00-16:00 are now 60 per cent. Decide to hold crane operations from 14:00, move to interior shots. Log decision.
  5. 16:00: Wind eases, odds drop to 10 per cent for the rest of the day. Resume crane operations, make up lost time.

Setting your limit from your own document

Your operational limit for wind is a critical parameter that must be accurately entered into the instrument. This limit, such as 25 mph gust at 20 metres for a camera crane, is not something the instrument dictates. Instead, it is derived directly from your own operational documents, such as equipment manufacturer guidelines, your production's plan, or specific requirements from your insurer.

For general crane operations, an indicative guidance often suggests stopping lifting at 32+ mph. However, your specific camera equipment or set design may have a different, often lower, threshold. It is your responsibility to consult these documents and input the precise limit that applies to your particular situation.

The instrument allows you to preset your working height to 20 metres and your limit to 25 mph for gust at crane height. This ensures that all forecasts and odds calculations are directly relevant to your specific operational parameters. This customisation is essential for making informed decisions on set.

The record, and why it matters here

For film and TV production units, maintaining a clear record of wind conditions and operational decisions is vital. The instrument provides a dated record page that logs what was forecast, what was observed, the specific limit you were using, and the call you made (e.g., shoot or hold). This record is an essential part of your production's documentation.

In the event of an incident or for post-production review, your insurer may request proof that you stopped operations at the appropriate time based on prevailing conditions. This dated record provides concrete evidence of your adherence to operational protocols and your own defined limits. It demonstrates due diligence in managing wind-related risks.

Beyond insurance, this record helps with internal reviews, aiding in planning for future shoots in similar locations or with similar equipment. It offers a factual basis for understanding past decisions and refining future operational strategies, contributing to overall production efficiency and risk management.

Ireland

Ireland's location on the Atlantic coast means that film and TV production units often experience changeable and sometimes strong wind conditions, particularly during the storm season from October to March. Even outside these months, exposed locations can present wind challenges. Met Éireann, as the national forecaster, provides general meteorological information, but your needs are more specific.

Production units operating in Ireland, whether on exposed coastal locations or in more sheltered areas, require precise, localised wind data for their equipment. The instrument provides wind forecasts interpolated to your specific working height, which is crucial for managing operations involving camera cranes, drones, or elaborate exterior sets that are sensitive to wind.

Having a clear understanding of potential wind impacts is important for scheduling and logistical planning, helping to avoid costly downtime. The ability to monitor and record wind conditions accurately supports the robust production environment in Ireland, as detailed in resources like the Screen Ireland production guide.

Questions people ask

How does the instrument help with last-minute changes to the shoot schedule due to wind?

The instrument provides hourly odds of exceeding your wind limit, allowing you to anticipate potential disruptions. By seeing where models agree or disagree, you can assess forecast reliability. This enables proactive planning, such as preparing alternative shots or rescheduling wind-sensitive operations before the crew is on standby. This helps to reduce costly downtime associated with sudden changes, keeping your production on schedule and within budget.

Can I use the instrument for different types of equipment, like drones and camera cranes, if they have different wind limits?

Yes, you can set different operational limits and working heights within the instrument to match various equipment. For instance, you can define a specific height and gust limit for a camera crane and then adjust these parameters for a drone, which might have a different maximum operating wind speed. This flexibility ensures the wind data is always relevant to the specific equipment being used. This allows for tailored wind assessments for each piece of gear on set.

What if my production's wind limit is not a standard height like 10 or 20 metres?

The instrument interpolates wind data to your exact working height, even if it is not one of the standard model levels (10, 80, 120, 180 metres). You simply input your specific working height in metres, and the instrument will provide the relevant wind forecast and odds for that precise elevation. This ensures the data is always directly applicable to your specific operational needs, regardless of the height of your equipment.

How does the 'Agreement Spine' help me make decisions when forecasts might be uncertain?

The Agreement Spine visually represents the consensus among different weather models. When the models show high agreement, you can have greater confidence in the forecast. If there's significant disagreement, it signals higher uncertainty. This insight helps you gauge the reliability of the forecast and adjust your decision-making accordingly, perhaps by building in more contingency time or preparing for a potential hold if model agreement is low.

Can I get a summary of the wind forecast for my call sheet?

Yes, the instrument can provide a concise wind note that you can integrate directly into your call sheet. This summary typically includes key information such as the forecast wind speeds and gusts for critical operational periods, along with the odds of exceeding your set limit. This ensures that all relevant personnel are aware of the expected wind conditions for the day.

What you use today, and what this adds

What you use todayCost
A free forecast appFree
The national weather service forecast and warningsFree
A commercial weather service on contractOn contract

What this adds

  • Shear Glass at 20 m
  • P(>limit) per hour
  • Frozen record page

Set it up in a minute

Preset
Crane
Height
20 m
Limit
11.2 m/s
Place
Dublin
Open the instrument set up for you

ProPro adds alerts before your limit breaks and the 06:00 brief for every site.

Try it first, no account.

In Ireland

Where people in this work talk

Read next

Industry guides

Others in aviation, events and public bodies

Sources

  1. Irish Examiner: Irish film industry 'exceptionally strong' 2026
  2. CSATF Safety Bulletin 25: camera cranes

The Wind Agent shows the wind and the odds. Your limit and the competent person on site make the call.

Figures on this page are desk research; we are verifying them with operators.