Energy and utilities

Grid operators and overhead line maintenance (ESB Networks, EirGrid contractors): the wind call, at your height

Tell my crew supervisor if gusts will pass our limit this morning.

  • A dated record of the decision.
  • Low-level gusts for the line route, not hub height.

Network controller / line crew supervisor / contractor safety manager

The decision

Allow live or exposed overhead-line work and crane or MEWP work near lines to proceed.

How often
Per job / daily
Your limit, for example
Your own limit: no single published figure, so you set it.
Height that matters
20 m
The number to watch
gust near conductor height

Live, right now, at 20 m

These are the real charts, running for Dublin Port. Search for your own place to re-point them.

SEE THIS AT YOUR SITE Dublin Port
Shear Glass Dublin Port · 20 m
CHART LOADINGglassReading Dublin Port…

The wind column with your height (20 m) picked out.

Exceedance fan Dublin Port · 10 m
CHART LOADINGfanReading Dublin Port…

Set your own limit in the instrument to see the odds of passing it. Odds at 10 m, the nearest ensemble level to your 20 m.

Agreement strip Dublin Port · 10 m
CHART LOADINGagreement_stripReading Dublin Port…

Where the weather models agree, and where they do not.

The call you make

As a network controller or line crew supervisor, you make decisions daily or per job on whether to allow live or exposed overhead-line work, or crane and MEWP work near lines. These decisions are critical for operational continuity and the well-being of your crew. Your decision determines if work proceeds or is postponed, directly impacting project timelines and resource allocation.

A wrong call, whether to proceed or to stop work unnecessarily, carries consequences. Proceeding in unsuitable conditions can lead to hazardous situations, while stopping work when conditions are acceptable leads to avoidable downtime and delays.

Your own document outlines the specific conditions under which certain tasks can or cannot be performed. This document is your primary reference for setting wind limits. The instrument provides wind information tailored to your working height and the specific metric you need, assisting you in making an informed decision consistent with your operational guidelines.

Ultimately, the responsibility for the call rests with the competent person on site, guided by your organisation's system of work and the real-time data available.

Where the wind actually is for you

Your work involves specific heights, particularly near conductor level, which may be around 20 metres. The Wind Agent provides wind information at 10, 80, 120, and 180 metres, and interpolates this to your exact working height. This ensures the data reflects the conditions where your crew is operating, rather than a general measurement taken at a different height.

For overhead line work, gust speed near conductor height is often the critical metric. A gust is a short-duration increase in wind speed, which can pose a greater risk than the mean wind speed during certain operations. The instrument displays gusts alongside the mean wind speed, allowing you to assess both components.

Your organisation's system of work sets the wind speed limit for specific tasks. This limit is not a universal standard but is tailored to your equipment, procedures, and the type of work being performed. You will input this limit into the instrument, which then uses it to compute the P(above your limit) by the hour, helping you determine if conditions are within your operational parameters.

Heights below 10 metres are extrapolated below the lowest model level and are clearly badged as such, indicating that these values are derived rather than directly modelled.

Reading the odds for this work

The P(above your limit) by the hour shows the fraction of ensemble members that predict wind speeds will exceed your specified limit in a given hour. This percentage is not a calibrated certainty but indicates how many of the different model runs suggest conditions will be unsuitable. It helps you understand the likelihood of encountering your limit.

For example, if the P(above your limit) is 20 per cent, one in five model runs suggests conditions will exceed your limit. This might prompt you to monitor the forecast closely but proceed with caution. If it is 50 per cent, half the models indicate a potential issue, suggesting a higher risk and perhaps a need for contingency planning or a re-evaluation of the work schedule.

If the P(above your limit) reaches 80 per cent, four out of five model runs predict conditions will exceed your limit. This strongly indicates that work should be postponed or alternative measures taken, as the probability of unsuitable conditions is high. The Agreement Spine feature shows where the various weather models concur and where they diverge, providing additional context to the P(above your limit) figures.

Understanding these odds allows you to make a more nuanced decision than a simple go/no-go based on a single forecast value. It enables you to assess the risk and plan accordingly, aligning with your organisation's risk management protocols.

A day with it

It is an example day for a line crew supervisor, checking conditions for overhead line work at 20 metres, with a gust limit of 10 m/s.

At 06:00, the supervisor checks the instrument. For 08:00 to 12:00, the P(above your limit) is 20 per cent, with gusts forecast at 8 m/s. The supervisor decides to proceed with preparations but will re-check at 08:00.

At 08:00, the P(above your limit) for 09:00 to 13:00 has risen to 40 per cent, with gusts now forecast at 9 m/s. The supervisor instructs the crew to complete preparatory ground work but hold off on elevated tasks.

At 10:00, the P(above your limit) for 11:00 to 15:00 is 60 per cent, and gusts are forecast at 11 m/s. The supervisor issues a stop-work notice for all elevated tasks, citing the high probability of exceeding the gust limit.

At 12:00, the supervisor reviews the latest forecast. Gusts are still forecast at 11 m/s, and the P(above your limit) remains high.

At 14:00, the P(above your limit) for 15:00 to 19:00 has dropped to 30 per cent, with gusts at 7 m/s. The supervisor reviews the situation, noting the improving conditions, but decides to keep elevated work suspended for the day to avoid further delays and ensure crew well-being, rescheduling for the next day.

An example day for a line crew supervisor

  1. 06:00: Supervisor checks the instrument for overhead line work at 20 metres, with a gust limit of 10 m/s. For 08:00 to 12:00, P(above your limit) is 20 per cent, gusts forecast at 8 m/s. Decides to proceed with preparations.
  2. 08:00: Re-checks. P(above your limit) for 09:00 to 13:00 has risen to 40 per cent, gusts now forecast at 9 m/s. Instructs crew to complete preparatory ground work but hold off on elevated tasks.
  3. 10:00: P(above your limit) for 11:00 to 15:00 is 60 per cent, gusts forecast at 11 m/s. Issues a stop-work notice for all elevated tasks, citing high probability of exceeding the gust limit.
  4. 12:00: Reviews the latest forecast. Gusts are still forecast at 11 m/s, and the P(above your limit) remains high. Decision to keep elevated work suspended.
  5. 14:00: P(above your limit) for 15:00 to 19:00 has dropped to 30 per cent, with gusts at 7 m/s. Supervisor notes improving conditions but decides to keep elevated work suspended for the day to avoid further delays and ensure crew well-being, rescheduling for the next day.

Setting your limit from your own document

Your organisation's system of work document is the definitive source for establishing your wind speed limit. This document specifies the maximum allowable gust speed near conductor height for tasks such as live or exposed overhead-line work, or crane and MEWP operations. The instrument does not set this limit; it merely uses the value you provide.

When you first use the instrument, you will input this specific limit from your own document. This ensures that all forecasts and probability calculations are directly relevant to your operational thresholds. For example, if your document states a maximum gust speed of 10 m/s at 20 metres for a particular task, you will enter '10' for the gust limit and '20' for the working height.

This customisation is crucial because different tasks, equipment, and local conditions may necessitate varying limits. The instrument's default setting for this persona is a gust limit at 20 metres, which aligns with common requirements for overhead line work. However, you can adjust this to match the exact specifications in your own document.

By accurately setting your limit, you ensure that the information provided by the instrument directly supports your adherence to internal well-being standards and operational procedures, aiding in consistent decision-making.

The record, and why it matters here

A dated record of what was forecast, observed, the limit used, and the call made is an integral part of your operational process. This record page documents the conditions and decisions at the time of work, providing an auditable trail for every job. It is not just about adherence; it is about demonstrating due diligence and supporting your decisions with concrete data.

Contractors and internal auditors frequently request such records to verify that work was conducted according to operational protocols and within specified environmental limits. In the context of overhead line maintenance, where hazards are significant, a clear record can be essential for post-incident reviews or during routine inspections.

Your own reasons for needing this record are practical: it allows you to review past decisions, understand why certain calls were made, and identify patterns in wind conditions that affect your operations. This historical data can inform future planning and risk assessments, contributing to continuous improvement in your operational management system.

The instrument automatically records this information, creating a comprehensive log that you can refer to or present as needed. This feature helps to streamline documentation requirements and provides a transparent account of environmental conditions and operational responses.

Ireland

Ireland's geographical position means it is exposed to Atlantic weather systems, particularly during the storm season from October to March. This period often brings higher wind speeds and more frequent gusts, which directly impact overhead line maintenance operations. Met Éireann, as the national forecaster, provides general weather information, but specific, low-level wind data is crucial for your work.

During these months, the probability of exceeding wind limits for live or exposed overhead-line work increases significantly. This seasonality necessitates careful planning and robust decision-making processes to avoid unnecessary risks or delays. The instrument helps you navigate these challenging conditions by providing detailed wind forecasts tailored to your working height and specific metric.

For example, during a typical winter, you might observe a higher P(above your limit) for extended periods, prompting more frequent checks and potential adjustments to your work schedule. This proactive approach, informed by precise wind data, helps maintain operational continuity while managing environmental risks effectively.

Questions people ask

How does the instrument help with varying wind conditions along a long line route?

The instrument provides localised wind information for your specific work site. While it does not offer a continuous map of an entire line route, you can use it to check conditions at different points along the route by adjusting your location. This allows you to assess wind conditions relevant to each segment of the line where work is planned, helping you make informed decisions for different sections of the project. You would input the coordinates for each specific work location to get the relevant forecast.

Can I use this for planning work weeks in advance?

The instrument provides forecasts for upcoming days, but the accuracy of wind forecasts naturally decreases further into the future. It is most effective for short-term operational planning, typically for the next one to three days, when decisions about proceeding with work are made. For long-range planning, it can give an indication of general trends, but for definitive go/no-go decisions, it is best to consult the forecast closer to the work date. The instrument is designed for day-to-day operational decisions.

What if my organisation's limit changes for different types of work?

The instrument allows you to easily adjust your wind speed limit. If your organisation has different limits for various tasks, such as live-line work versus crane operations, you can update the limit in the instrument to match the requirements for the specific task at hand. This flexibility ensures that the P(above your limit) calculations are always relevant to the current work being performed, aligning with your internal procedures.

How does the instrument account for terrain effects on wind?

The underlying weather models used by the instrument incorporate terrain data to produce their forecasts. This means the wind predictions reflect the influence of local topography, such as hills or valleys, on wind flow. While the instrument itself does not directly model terrain, it utilises the detailed outputs from these sophisticated weather models to provide as accurate a representation of local wind conditions as possible for your specified location and height.

Is the instrument suitable for all heights of overhead line work?

The instrument provides wind information at 10, 80, 120, and 180 metres, and interpolates to your exact working height. This covers typical heights for overhead line maintenance, including work near conductor level, which is often around 20 metres. Heights below 10 metres are extrapolated and clearly badged. This means you can get relevant wind data for most overhead line tasks, ensuring the information is specific to where your crew is operating.

What you use today, and what this adds

What you use todayCost
The national weather service forecast and warningsFree
A commercial weather service on contractOn contract

What this adds

  • P(>limit) per hour
  • Frozen record page

Set it up in a minute

Preset
Crane
Height
20 m
Limit
you set it
Place
Dublin Port
Open the instrument set up for you

OpsOps adds the fleet board across all your sites and public boards your crews can open.

Try it first, no account.

In Ireland

ESB Networks issues stop-work notices to contractors near overhead lines.

Where people in this work talk

  • ESB Networks supplier community

Read next

Industry guides

Others in energy and utilities

Sources

  1. ESB Networks - Safe construction with electricity 2018
  2. ESB Stop Work Notice (Irish Water HSQE)
  3. JJ Keller - live-line barehand work

The Wind Agent shows the wind and the odds. Your limit and the competent person on site make the call.

Figures on this page are desk research; we are verifying them with operators.